Renovation inside a shared building

Condo Renovation in Vancouver

A condo renovation is building work inside a building you share with other owners. The strata corporation must approve most of it in writing. Some of the pipes and ducts in your walls belong to all the owners. The building decides when work can happen and how materials reach your door. RealDream Contracting takes on condo kitchens, bathrooms, flooring and full interiors in Vancouver and downtown Vancouver, and we read your building's bylaws before we price the work.

What we do in a condo renovation

We renovate the inside of a condo: one room or the whole unit. The building work matches a house renovation, and the planning has more steps, because every choice has to fit the building's bylaws, its shared pipes and its rules for working hours and deliveries.

One contract covers the planning, the strata request, the trades and the finishing.

  • Kitchens: cabinets, counters, backsplash tile, lighting, plumbing and appliance installation, with the sink and the range placed where the building's drains, ducts and electrical supply allow.
  • Bathrooms: waterproofing, tile, fixtures, vanity and fan, with the shower base tested with water before any tile is laid.
  • Flooring: removal of the old floor and installation of the new one, with the sound-rated layer under it where your building's bylaws require one.
  • Full interiors: kitchen, bathrooms, flooring, doors, trim, lighting and paint planned as one job with one schedule.

How we handle the strata request and the building's rules

We prepare the renovation request with you and send it in the form your building asks for. Under BC's Standard Bylaws, an owner needs the strata corporation's written approval before altering the parts of a unit listed in Bylaw 5(1), and that list includes the original flooring, plumbing fixtures and electrical fixtures. Your building's own bylaws can ask for more.

The request uses the same scope of work as our contract, so the council approves the work that will be built. It names every wall, pipe, drain, wire and duct the work will touch, and it attaches the drawings, the product sheets and the contractor documents your building lists.

We set the start date after the written approval arrives. If the council asks for a change, we revise the scope, the price and the schedule together and send them back as one document.

During the work we follow the building's rules. We work inside the hours it allows, book the elevator and the loading area where it requires a booking, and protect the hallway and elevator surfaces it asks us to protect. Under section 130(1) of the Strata Property Act, a strata can fine the owner when a contractor breaks a bylaw or rule, so we read those rules before the first day.

What we check before quoting

We visit the unit and read the building's documents before we give a price. A condo price depends on conditions that cannot be seen from a floor plan.

  • The bylaws, the rules and any renovation form or alteration agreement: working hours, insurance documents, deposits, fees and flooring requirements.
  • Where the drains and water pipes run, and which ones serve other units. Under the Strata Property Act, a pipe that can serve another unit is common property.
  • What the floor and the walls are made of, and whether a wall you want removed is part of the building's structure.
  • Where each fan and hood connects, and whether that duct is shared.
  • The electrical panel, and what the strata's electrical planning report says about the building's capacity.
  • The age of the building. WorkSafeBC says a home built before 1990 is likely to contain some asbestos.
  • The route from the loading area to your door: the elevator size, the booking rules and the surfaces that need protection.

Hazardous materials and permits

We arrange an inspection for hazardous materials before the price is fixed. Section 20.112 of BC's Occupational Health and Safety Regulation requires the employers and the owner to ensure that a qualified person inspects for hazardous materials, including asbestos, before renovation work begins. If the report finds any, a contractor licensed by WorkSafeBC contains or removes it before our work in that area starts.

Electrical and gas work is done by licensed contractors under permits. Technical Safety BC states that owners of a strata must hire a licensed contractor for this work, and it lists the City of Vancouver as issuing its own electrical and gas permits. For building permits, we confirm with the City what your scope of work needs before we give a start date.

How a condo renovation is priced

A condo renovation is priced after a site visit and a read of your building's bylaws. We publish no condo price list, because the building's rules change the amount of labour from one address to the next.

For comparison, these are our published 2026 ranges for the same rooms in a North Shore house: $65,000 to $110,000 for a full kitchen replacement in the same layout, and $28,000 to $48,000 for a full bathroom in the existing layout. They are house figures. A condo quote adds the conditions below.

  • The working hours your building allows, which set how many days the work takes.
  • Time spent moving materials and waste through the elevator in small loads.
  • Protection for the hallway, the elevator and the lobby.
  • The hazardous materials inspection, and removal where the report requires it.
  • Fees or deposits your building charges under its bylaws or rules.
  • A sound-rated layer under new flooring, where the bylaws require one.

Examples of our finished rooms

The galleries linked on this page show kitchens, bathrooms and flooring we have finished. Use them to judge the standard of our cabinet, tile and flooring work.

Common questions

What condo renovation work does RealDream do in Vancouver?

We renovate condo kitchens, bathrooms, flooring and full interiors in Vancouver and downtown Vancouver. One contract covers the planning, the strata request, the trades and the finishing. Before we price the work we read your building's bylaws and rules, because they set the working hours and the documents the strata expects.

Does RealDream prepare the strata renovation request?

Yes, we prepare the request with you and send it in the form your building asks for. It lists the scope of work, the drawings, the product sheets and the contractor documents the building requires. Standard Bylaw 5(1) requires the strata corporation's written approval before the alteration is made, so we start only when you hold that approval.

What do you check before quoting a condo renovation?

We read the bylaws, the rules and any alteration agreement, and we visit the unit. On the visit we find where the drains, ducts and wiring run, what the floor and walls are made of, and how materials will travel from the loading area to your door. A pipe that can serve another unit is common property under the Strata Property Act, so we name each one in the request.

How does RealDream price a condo renovation?

We price a condo renovation after a site visit and a read of your building's bylaws, and we publish no condo price list. Our published 2026 ranges are for North Shore houses, for example $65,000 to $110,000 for a full kitchen replacement in the same layout. A condo quote adds the building's own conditions, such as limited working hours and booked elevator times.

Do you arrange asbestos testing before a condo renovation?

Yes, we arrange the inspection before the price is fixed. Section 20.112 of the Occupational Health and Safety Regulation requires a qualified person to inspect for hazardous materials before renovation work begins. Since January 1, 2024, a contractor that removes asbestos must be licensed to operate in BC, so removal is done by a company on WorkSafeBC's list.

Who applies for the electrical and gas permits on a condo renovation?

The licensed electrical or gas contractor applies for the permit. Technical Safety BC states that owners of a strata cannot obtain homeowner permits and must hire a licensed contractor, and that the contractor applies on the owner's behalf. Technical Safety BC lists the City of Vancouver as issuing its own electrical and gas permits, so inside the city the application goes to the City.

When does work start on a condo renovation?

Work starts after the strata's written approval arrives and the permit question is settled with the City. Under section 34.1 of the Strata Property Act, a council must hold a hearing within 4 weeks of an owner's written request for one and give a written decision within one week after it.

How do you move materials and waste through a condo building?

We follow your building's bylaws and rules for the elevator, the loading area and waste. Where the building requires an elevator booking, deliveries and waste removal are scheduled inside the booked times, in loads that fit the elevator. We cover the hallway and elevator surfaces the building asks us to protect before the first delivery.

Guides

Further reading

Free quote

Get a project estimate

Share a few details and we'll respond within one business day.

Related projects

See this work in practice.

Browse projects from our portfolio that relate to this service.

Ready to start?

Talk to RealDream Contracting.

Call (604) 401-4849, send an inquiry, or book a consultation to discuss your project.

RealDream × Realtors

Let's build something together.

Leave your details. Let's talk about working together.

An introduction starts the conversation. Partnership terms are agreed together.

Prefer a conversation? (604) 401-4849