What a Condo Renovation Costs in Vancouver, and What Sets the Price

This page explains what sets the price of a condo renovation in Vancouver. We publish no condo price list, so it starts with the 2026 ranges we publish for the same rooms in a house on the North Shore, each one labelled as a house figure. It then lists the conditions in a condo building that add work to the same scope, the parts of a house job that a condo leaves out, and what we need to see before we give a fixed price.

By Nima Gerani, Founder, RealDream Contracting
October 4, 2026 11 min read

The short answer

RealDream publishes no price list for condo renovations in Vancouver, because each building's bylaws and rules change the amount of labour. Our published 2026 ranges for North Shore houses are $65,000 to $110,000 for a full kitchen replacement in the same layout and $28,000 to $48,000 for a full bathroom in the existing layout. A condo quote prices the same work under your building's conditions.

Note: Every dollar range on this page is a figure RealDream published in 2026 for houses on the North Shore, shown for comparison. A condo price is set after a site visit and a read of the building's bylaws. Section numbers and government figures were read on October 4, 2026 and can change.

Why we publish no condo price list

Two condo kitchens with the same cabinets and counters can need different amounts of labour, because each building decides how work inside it is done. One building may allow work during more hours of the day than another. One may require a booked elevator for every delivery. One may ask for a deposit and a set of documents before the first day.

These conditions are written in each building's bylaws, its rules and its alteration agreement, the written permission with conditions that some stratas ask an owner to sign before a renovation. Section 120 of BC's Strata Property Act lets a strata file its own bylaws in place of the Standard Bylaws, so the conditions differ from one address to the next.

A price list would have to assume one set of conditions. We read your building's documents and visit the unit, then price the work for that building.

Our published 2026 ranges for the same work in a house

The table gives the ranges we publish for houses on the North Shore, taken from our renovation costs guide. Read each one as the price of that building work in a house.

RealDream's published 2026 ranges for North Shore houses
Work in a house Published range Published time on site
Kitchen, cosmetic refresh $28,000 to $50,000 3 to 5 weeks
Kitchen, full replacement, same layout $65,000 to $110,000 8 to 12 weeks
Kitchen with layout change and plumbing relocation $95,000 to $160,000 8 to 14 weeks
Powder room refresh $9,000 to $18,000 1 to 2 weeks
Bathroom, full gut, existing layout $28,000 to $48,000 4 to 6 weeks
Primary ensuite with layout change $60,000 to $120,000 5 to 8 weeks
Whole-home cosmetic refresh $80 to $140 per sq ft 2 to 4 months
Whole-home substantial renovation $175 to $275 per sq ft 6 to 10 months

How to read the house ranges

Each range is construction cost only. Design fees, municipal permit fees, engineering, appliances and furnishings are separate.

We publish no figure for flooring alone, in a house or in a condo. A flooring price depends on the product, the area, the state of the floor underneath and, in a condo, the layer your building's bylaws require under the new floor.

We apply no percentage to these ranges to reach a condo price. Each condition in the next section is priced as its own line, after we have read your building's documents.

What a condo adds to the same scope

A condo adds planning before the work and labour during it. The table lists each condition, the work it adds, and who sets it. Ask your strata for its own answers in writing, because each building sets its own hours, bookings, fees and deposits.

Conditions in a condo building that add work to a renovation quote
Condition Work it adds Who sets it
The strata request Writing the scope, drawings, product sheets and contractor documents, and answering the council's questions Standard Bylaw 5(1) requires written approval first. Your building's bylaws and form list the documents
Working hours More days on site for the same hours of work, where the building allows a shorter working day Your building's bylaws, rules or alteration agreement
Elevator bookings Deliveries and waste removal divided into loads that fit the booked times Your building's rules
Carrying materials Labour to move each load from the loading area to the unit by hand or on a cart The route in your building, which we walk on the site visit
Protection of common areas Covering the hallway floor, the elevator and the door frames, then removing the covers and cleaning Your building's rules. Standard Bylaw 3(2) forbids damage to the common property
Hazardous materials An inspection and written report by a qualified person. Removal by a licensed contractor where the report finds asbestos Occupational Health and Safety Regulation, section 20.112
Cutting or drilling concrete A risk assessment, dust capture at the tool and containment of the work area Occupational Health and Safety Regulation, sections 6.112 to 6.112.2. Standard Bylaw 5(1)(a) where the concrete is structure
Electrical and gas work Licensed contractors, and permits for the work that needs them Technical Safety BC licenses the contractors. The City of Vancouver issues the permits
Fees and deposits Amounts the building charges an owner who renovates Your building's bylaws or rules. We show them as separate lines

Hazardous materials: the inspection comes before the price

Section 20.112 of the Occupational Health and Safety Regulation requires the employers responsible for a renovation, and the owner, to ensure that a qualified person inspects the building for hazardous materials before work begins. The qualified person takes samples and writes a report that gives the location and the approximate quantity of each hazardous material.

The report changes the price in one of two ways. If it finds nothing hazardous in the areas the work will disturb, the cost is the inspection alone. If it finds asbestos, that material must be contained or removed before any work that may disturb it, and a qualified person must confirm this in writing (section 20.112(7) and (8)). WorkSafeBC states that since January 1, 2024, asbestos abatement contractors, the companies that remove or contain asbestos, must be licensed to operate in BC.

We state no price for an inspection or for removal, because we have no published figure for either. We arrange the inspection before the price is fixed, so the quote you sign already includes the result. The same rule applies to a house. In a condo, send the report to the strata with your request.

Concrete, electrical and gas work

Cutting or drilling concrete adds two kinds of work. The first is approval. Where the concrete is part of the building's structure, Standard Bylaw 5(1)(a) requires the strata's written approval, and your building may ask for a structural engineer's letter with the request.

The second is dust control. WorkSafeBC says cutting, drilling or grinding concrete releases silica dust, which can cause silicosis, a lung disease that cannot be reversed. Section 6.112 of the regulation requires a risk assessment by a qualified person before workers do this work. Section 6.112.2 puts dust reduction systems and containment first among the controls. In a condo, the containment also has to keep the dust out of the hallway.

Electrical and gas work is done by licensed contractors under permits. Technical Safety BC states that owners of a strata cannot obtain homeowner permits and must hire a licensed contractor. Its examples of electrical work that needs a permit include moving an outlet and connecting a dishwasher or a range hood. Inside the City of Vancouver, the City issues these permits and sets the fees. We confirm the amounts with the City for each job and state none here.

The strata's insurance deductible

One cost of a condo renovation is outside the contractor's quote: the risk that a leak during the work leads to a claim on the strata's insurance. A deductible is the first part of a claim, which the insurer leaves the insured party to pay.

The Province of BC says strata corporation deductibles can range from $100,000 to $750,000 or higher. It also says a strata may recover the deductible from an owner who is deemed responsible for the loss, and that an owner can be deemed responsible without being negligent.

The same page says an owner's own policy can cover some or all of that deductible. Call your insurance broker before the work starts, say that the unit will be under renovation, and ask what the policy covers during that time. Only the broker can tell you whether your premium changes.

Your building's bylaws or alteration agreement set the liability insurance a contractor must show. We send our certificate with the strata request.

What a condo leaves out compared with a house

A renovation inside a condo unit has no roof, siding, foundation or yard drainage in its scope. Under Standard Bylaw 8, the strata corporation repairs and maintains the common property, and inside a unit it repairs the structure of the building, the exterior, and the doors, windows and skylights on the exterior. Those parts are the strata's to repair.

A house renovation can include work on any of those parts, and the house owner pays for all of it. A condo owner's contract covers the inside of the unit.

Two limits apply. An owner still needs the strata's written approval to change an exterior window or door, under Standard Bylaw 5(1)(d). And section 72 of the Act lets a strata pass a bylaw that makes an owner responsible for repairing limited common property the owner has a right to use, such as a balcony. Read your building's bylaws for a clause of that kind.

What we need to see before we give a fixed price

A fixed price needs a written scope and the facts about your building. We ask for these before we quote:

  • The unit itself, on a site visit. We find where the drains and ducts run, what the floor and walls are made of, where the electrical panel is, and how materials will travel from the loading area to your door.
  • The bylaws, the rules and any renovation form or alteration agreement. The strata must provide the bylaws and rules within one week of an owner's request (Strata Property Act, section 36(3)).
  • The registered strata plan, the drawing that shows the boundaries of your unit and the common property. The strata must keep a copy (section 35(2)(b)) and provide its records within 2 weeks of a request (section 36(3)).
  • Any drawings of the building the strata holds for the walls and pipes the work will touch.
  • The hazardous materials report for the areas the work will disturb.
  • Your choices of flooring, fixtures and appliances, because the strata request needs the product sheets.

Before the fixed price, and after the council answers

Before we have those documents, we can give a range and name each unknown fact that could change it. If the council asks for a change to the work, we revise the scope, the price and the schedule together and send them back as one document.

The calculators on this site

Three calculators on this site help with early planning. All three are built on our published figures for houses.

The renovation cost calculator gives a kitchen or bathroom range by scope and room size. The project timeline calculator lists the stages of a kitchen or bathroom renovation in weeks, and its stages include no time for strata approval. The renovation ROI calculator compares the cost of a renovation with the value it adds to the home.

Use each result as the house figure for the same work. Then ask us for a quote for your building.

Sources

Frequently asked questions

Why does the same kitchen cost a different amount in two condo buildings?

The same kitchen costs a different amount in two condo buildings because each building sets its own conditions for renovation work. Section 120 of the Strata Property Act lets a strata file its own bylaws in place of the Standard Bylaws, and those bylaws and rules decide the working hours, the elevator bookings and the documents required. Fewer working hours in a day mean more days on site for the same work.

What does a full kitchen replacement cost in a North Shore house in 2026?

Our published 2026 range for a full kitchen replacement in the same layout, in a North Shore house, is $65,000 to $110,000, with 8 to 12 weeks on site. That is construction cost only: design fees, municipal permit fees, engineering and appliances are separate. It is a house figure. We price a condo kitchen after a site visit and a read of the building's bylaws.

What does a full bathroom renovation cost in a North Shore house in 2026?

Our published 2026 range for a full bathroom renovation in the existing layout, in a North Shore house, is $28,000 to $48,000, with 4 to 6 weeks on site. A primary ensuite with a layout change is $60,000 to $120,000 over 5 to 8 weeks. Both are house figures for construction cost only. A condo bathroom is priced for its own building after a site visit.

Does RealDream publish a price for condo flooring alone?

We publish no price for flooring alone, in a condo or in a house. A condo flooring price depends on the product, the area and the layer your building requires under the floor to reduce sound. Section 9.1 of the Strata Property Regulation names floor coverings as fixtures, so replacing an original floor also needs a strata request under Standard Bylaw 5(1)(g), and preparing that request is part of the work.

Who is responsible for the hazardous materials inspection before a condo renovation?

The owner and the employers responsible for the work share the duty to have a condo inspected for hazardous materials before a renovation. Section 20.112(2) of the Occupational Health and Safety Regulation says all employers responsible for the work, and the owner, must ensure a qualified person inspects the building first. We arrange the inspection before the price is fixed and show its cost as a separate line in the quote.

Does a condo renovation quote include the strata's fees and deposits?

Our condo renovation quotes show the strata's fees and deposits as separate lines, using the amounts in your building's bylaws or rules. Each building sets these amounts for itself. The Province of BC's strata page says bylaws may require written permission before a renovation, often called an alteration agreement, and that document is where many of these amounts are written.

Does a condo owner pay for roof or exterior repairs as part of a renovation?

A renovation inside a condo unit has no roof or exterior repair in its scope. Under Standard Bylaw 8, the strata corporation repairs and maintains the common property, and inside a unit it repairs the structure of the building and the exterior. Section 72 of the Strata Property Act lets a strata pass a bylaw making an owner responsible for limited common property such as a balcony, so read your building's bylaws.

How quickly must a strata give an owner the documents needed for a renovation quote?

A BC strata must give an owner its bylaws and rules within one week of a request, and its other records within 2 weeks, under section 36(3) of the Strata Property Act. The records it must keep include the registered strata plan (section 35(2)(b)). We ask for the bylaws, the rules, any alteration agreement and the strata plan before quoting a condo renovation, so request them early.

Does the renovation cost calculator on this site work for a condo?

The renovation cost calculator on this site gives house figures, so use its result as the price of the same work in a house. It is built on our published 2026 ranges for North Shore houses, and it multiplies the range by 0.85 for a kitchen under 100 square feet. It has no entry for a condo building's conditions, such as booked elevator times or limited working hours.

Is a whole-condo renovation priced per square foot?

We price a whole-condo renovation from a written scope after a site visit, and we publish no per-square-foot figure for condos. Our published 2026 figures per square foot are for houses on the North Shore: $80 to $140 for a whole-home cosmetic refresh and $175 to $275 for a substantial renovation. They are construction cost only, and they were written for house conditions.

Related service

Condo Renovation

See how we handle condo renovation projects across the North Shore.

Learn about condo renovation

Free quote

Get a project estimate

Share a few details and we'll respond within one business day.

Ready to build?

Talk to RealDream Contracting.

Call (604) 401-4849, send an inquiry, or book a consultation to discuss your project on the North Shore.

RealDream × Realtors

Let's build something together.

Leave your details. Let's talk about working together.

An introduction starts the conversation. Partnership terms are agreed together.

Prefer a conversation? (604) 401-4849