Common questions
Frequently asked questions about renovation cost.
Straight answers based on real project experience in North Vancouver.
How accurate is this renovation cost calculator?
The calculator provides ballpark estimates within ±15 to 20% of typical project costs. It uses 2026 North Vancouver market data but cannot account for site-specific conditions, hidden damage behind walls, or highly customized material selections. For an accurate number, you need a proper site assessment and detailed quote from RealDream Contracting.
Do renovation costs include permits in North Vancouver?
The calculator estimates include typical permit costs. In North Vancouver, building permits for renovation typically run $1,500 to $5,000 depending on project value and complexity. Plumbing and electrical permits are additional. We handle all permit applications as part of the project.
What's the cheapest type of renovation?
A cosmetic bathroom refresh (new vanity, toilet, fixtures, paint) is typically the lowest-cost renovation at $15,000 to $25,000. However, the best value renovation depends on your goals. A $30,000 basement finishing project can add more functional living space per dollar than almost any other renovation type.
How much should I budget for a renovation contingency?
We recommend a 5 to 10% contingency depending on the age of your home. For homes built before 1970, aim for 10%: older homes are more likely to have surprises like knob-and-tube wiring, galvanized plumbing, or insufficient structural support that only become visible during demolition.
Can I renovate in phases to spread the cost?
Yes, phased renovations are common. Many North Vancouver homeowners start with the kitchen or a bathroom, then tackle other rooms over 1 to 3 years. We can help plan a phased approach that avoids rework: for example, running electrical for a future kitchen island during a nearby bathroom renovation.
Does RealDream provide fixed-price quotes?
Yes. After a detailed site assessment and design consultation, we provide a fixed-price quote for the agreed scope of work. The number you sign is the number you pay. No surprise invoices at the end. Changes to scope during the project are documented and priced transparently.
Why does renovation cost more in North Vancouver than the rest of Metro Vancouver?
North Vancouver renovation costs tend to run 10 to 15% higher than the Metro Vancouver average because of hillside access challenges, an older home stock that requires more structural work, and strong trade labour demand on the North Shore. Journeyman electricians, plumbers, and carpenters here command $45 to $85 an hour.
How much of a renovation budget goes to labour versus materials?
In a typical mid-range North Vancouver renovation, labour and trades take up 35 to 45% of the budget, while materials and fixtures take 25 to 35%. The rest splits across design and permits (8 to 12%), demolition and prep (5 to 10%), project management (10 to 15%), and contingency (5 to 10%).