What a Condo Renovation Quote Should List, and What to Ask Before You Sign

A quote for a house lists the work, the materials and the price. A quote for a condo has to cover the building as well: its approval process, its fees, its hallways and its neighbours. This page lists the items a condo quote should list, with the law or public page behind each one, and the questions to ask before you sign.

By Nima Gerani, Founder, RealDream Contracting
November 25, 2026 7 min read

The short answer

A condo renovation quote in Vancouver should list the work that needs the strata's written approval, who prepares the strata request, who pays the building's fees and deposits, the hazardous materials inspection that section 20.112 of BC's Occupational Health and Safety Regulation requires, the licensed electrical and gas contractors, protection of the common areas, and how the price changes if the strata sets a condition.

Note: Section numbers and page wording were read on October 4, 2026 and can change. Fees, deposits and insurance amounts are set by each building, and City of Vancouver permit fees are set by the City, so this page states none. This is general information from a renovation contractor. Get legal advice before you sign a contract you are unsure of.

The items to look for

Read the quote against this table. An item the quote leaves out is a question to ask in writing.

Items a condo renovation quote should list, and the source behind each
Item What the quote should say Source
Scope and approval Each piece of work, and which pieces need the strata's written approval Standard Bylaw 5(1), or your building's own bylaws
The strata request Who prepares the drawings, product sheets and contractor documents, and whether that work is in the price Your building's renovation form or alteration agreement
Building fees and deposits Who pays each one, and whether the amount is in the price Strata Property Regulation, section 6.9, and your building's bylaws and rules
Hazardous materials inspection Who arranges it, whether it is in the price, and how removal is priced Occupational Health and Safety Regulation, section 20.112
Electrical and gas work The licensed contractor for each, and who applies for the permits Technical Safety BC
Common areas Protection of the elevator and hallways, cleaning and waste removal Standard Bylaw 3(2)
Insurance and WorkSafeBC A liability insurance certificate and a clearance letter Your building's bylaws or alteration agreement, and WorkSafeBC

Scope, written against your building's bylaws

Ask whether the contractor has read your building's bylaws, rules and renovation form. A quote written without them leaves out the conditions your building sets.

Under the Standard Bylaws, the approval list in Bylaw 5(1) includes the parts of a unit the strata must insure. Section 9.1 of the Strata Property Regulation defines those as fixtures the original developer installed, including floor and wall coverings and electrical and plumbing fixtures. Most kitchen, bathroom and flooring work is on that list, so the quote should mark those lines as waiting for approval.

We write the scope once and use the same words in the quote and in the strata request, so the council approves the work the contract describes.

The strata request, fees and deposits

Ask who prepares the request to the strata and who answers the council's questions. Preparing it takes hours of work, and the quote should say whether those hours are in the price.

Ask who pays the building's charges. Section 6.9 of the Strata Property Regulation says a fee for the use of common property must be reasonable and must be set out in a bylaw or in a rule the owners have ratified. Each building sets its own amounts, so the quote should either include each charge by name or say that the owner pays it directly.

One document is yours alone to sign. Standard Bylaw 5(2) lets the strata require the owner to agree in writing to take responsibility for any expenses relating to the alteration. Read that agreement before you sign the contract. Section 59(3)(c) of the Act makes the strata disclose it on the Information Certificate, the form a buyer of the unit receives.

The hazardous materials inspection

Section 20.112 of the Occupational Health and Safety Regulation puts the duty on the employers responsible for the work and on the owner together. Before renovation work begins, they must ensure a qualified person inspects for hazardous materials and writes a report.

The quote should say who arranges the inspection and whether its cost is in the price. If the report is still to come, the quote should say how removal will be priced once the report gives the location and the approximate quantity of each material. Ask for the name of the removal company. WorkSafeBC states that since January 1, 2024, asbestos abatement contractors must be licensed to operate in BC, and it publishes a list of licensed contractors.

Electrical and gas: licensed contractors and permits

Technical Safety BC states that owners of a strata "cannot obtain homeowner permits and must hire a licensed contractor". It adds that the contractor applies for the permit on the owner's behalf, and advises: "Check to ensure there is one in place before work begins."

The quote should name the electrical contractor, and the gas contractor if the work touches gas. Technical Safety BC licenses these contractors across BC, including in the 10 municipalities that issue their own permits, and its website has a page for searching licensed contractors. Inside Vancouver the City issues the electrical and gas permits and sets the fees. Ask whether those fees are in the price.

Protection of the common areas, dust and waste

Standard Bylaw 3(2) forbids damage to the common property beyond reasonable wear and tear. The owner answers for the contractor: section 130(1) of the Strata Property Act lets the strata fine an owner when a person the owner admitted for business reasons contravenes a bylaw or rule, and section 133 lets it require the reasonable cost of a repair.

The quote should list the covering for the elevator and the hallway, cleaning at the end of each day, and removal of waste by the route the building allows. Where tile or concrete will be cut, ask how the dust will be captured.

Insurance and the WorkSafeBC clearance letter

Your building's bylaws or alteration agreement set the liability insurance a contractor must show. Ask for the certificate with the quote and compare its amount and dates with what the building asks for.

A clearance letter comes from WorkSafeBC, the agency that runs workplace injury insurance in BC. Its website says: "A clearance letter confirms a business is registered with us and paying its premiums." Its page for homeowners recommends checking before you hire, and says that if the business is unregistered or behind on payments, "as a customer you could be held responsible for its premiums".

You can look the letter up yourself. WorkSafeBC's online application searches by the firm's account number or its precise legal or trade name. A letter that shows the firm as "active and in good standing" is honoured up to a date shown in the body of the letter. Check that date against your working dates.

If the strata sets conditions after you sign

A council can answer a request with conditions, and a condition can change the work. Ask the contractor to put the answers to these questions in the quote or the contract.

  • Is the price fixed for the scope as it will be sent to the strata?
  • How is a change priced if the council requires a different product or method?
  • Does the start date wait for the strata's written approval?
  • What do I owe if the strata refuses the work and I cancel?

How we handle changes, and where to read about payments

If a council asks for a change, we revise the scope, the price and the schedule together and send them back as one document. We set the start date after the written approval arrives.

Deposits, payment schedules and the amount an owner holds back from each payment are covered in our contractor hiring guide, with the sources for each figure.

Sources

Frequently asked questions

Who signs the agreement on expenses that a strata can require, the owner or the contractor?

The owner signs the agreement on expenses. Standard Bylaw 5(2) lets a BC strata require, as a condition of approving a renovation, that the owner agree in writing to take responsibility for any expenses relating to the alteration. The bylaw names the owner, so the signature is yours. Read the agreement before you sign the renovation contract, and ask the contractor which of those expenses the quote already covers.

How do I check that an electrician named in a condo quote is licensed in BC?

Search for the electrical contractor on Technical Safety BC's website, which has a page titled Find a Licensed Contractor for contractors licensed to do regulated work. Technical Safety BC states that it oversees contractor licensing even in the 10 municipalities that issue their own electrical or gas permits, and the City of Vancouver is one of those. Ask the contractor for its licence number and compare it with the search result.

What should a condo quote say if the hazardous materials report is not done yet?

A condo quote written before the hazardous materials report should say that removal is priced after the report arrives. Under section 20.112(3) of BC's Occupational Health and Safety Regulation, the qualified person's written report gives the location and the approximate quantity of each hazardous material found. Until those two facts are known, a removal price is a guess. Ask the contractor to arrange the inspection before the price is fixed.

Could I owe WorkSafeBC premiums if my renovation contractor has not paid them?

Yes, WorkSafeBC says a customer can be held responsible. Its page for homeowners recommends that before you hire an independent business, you always make sure the business is registered and making payments as required, and it states: "If it is not, as a customer you could be held responsible for its premiums." Ask for a clearance letter with the condo renovation quote, or look the firm up on WorkSafeBC's website.

Until what date does a WorkSafeBC clearance letter cover a contractor?

A WorkSafeBC clearance letter covers a contractor up to the date printed in the body of the letter. WorkSafeBC says a letter describing a firm as "active and in good standing" is honoured up to the date to which the firm has paid what it owes, and that firms which prepay their premiums for the year receive clearance to January 1 of the following year. Get a new letter if your renovation continues past that date.

What should a condo quote say about dust from cutting tile or concrete?

A condo quote should name the method that captures dust where tile or concrete is cut. Under section 6.112.1 of BC's Occupational Health and Safety Regulation, when a risk assessment shows a worker may be exposed to silica dust, the employer must have a qualified person develop an exposure control plan and must put it into effect. Ask the contractor to describe that plan for your unit and the hallway outside it.

Should I sign a renovation contract before the strata approves the work?

You can sign a renovation contract before the strata approves the work if the contract says what happens when the answer is no or comes with conditions. Standard Bylaw 5(1) requires an owner to obtain the strata's written approval before making the alteration, so no work on the listed items can start earlier. Ask for a clause that sets the start date after written approval and states what you owe if you cancel.

Should a Vancouver condo quote include the electrical and gas permit fees?

A Vancouver condo quote should say whether electrical and gas permit fees are inside the price or billed separately. Technical Safety BC lists the City of Vancouver among the 10 municipalities that issue their own electrical and gas permits, so the City sets those fees. We state no City fee on this site because we could not read the City's pages on October 4, 2026. Ask the contractor for the fee in writing.

Related service

Condo Renovation

See how we handle condo renovation projects across the North Shore.

Learn about condo renovation

Free quote

Get a project estimate

Share a few details and we'll respond within one business day.

Ready to build?

Talk to RealDream Contracting.

Call (604) 401-4849, send an inquiry, or book a consultation to discuss your project on the North Shore.

RealDream × Realtors

Let's build something together.

Leave your details. Let's talk about working together.

An introduction starts the conversation. Partnership terms are agreed together.

Prefer a conversation? (604) 401-4849