In the Downtown local area, 31,230 of the 42,221 strata lots sit in buildings finished between 1990 and 2009. At the law's minimum terms, these buildings have passed their home warranty years, and the strata may have repaired outside walls and windows since. This page covers the warranty, the rules for envelope repairs and the strata records that show both. Asbestos, old pipes and electrical capacity are on our older tower page, and the order of a full gut renovation is on our gut renovation page.

By Nima Gerani, Founder, RealDream Contracting
October 24, 2026 9 min read

The short answer

The City's 2026 tax roll puts 31,230 of the Downtown local area's 42,221 strata lots in buildings from 1990 to 2009. At the legal minimum terms, the home warranty on a building first occupied by 2009 ended by 2019. Before planning a renovation, ask the strata for any envelope repair warranty and its expiry dates, the depreciation report and the building's permit drawings.

Note: Section numbers and page wording were read on October 24, 2026, and the City's figures on October 4, 2026. A warranty policy can give more than the legal minimum terms, so your building's own policy and expiry schedule set its dates. This is general information from a renovation contractor.

The commonest downtown building

The City of Vancouver's 2026 property tax roll lists 42,221 strata lots in the Downtown local area. A strata lot is one unit in a strata building, with its own title. BC Assessment's year built, published in that tax roll, puts 13,640 of them in buildings from 1990 to 1999 and 17,590 from 2000 to 2009. Together that is 31,230 lots, or 74.0 percent of the area. Another 6,869 date from 2010 to 2019, and 2,274 from before 1990.

The West End next door is older. Of its 9,888 strata lots, 4,242 were built before 1990, 3,141 in the 1990s and 962 in the 2000s. We read these figures from the City's Open Data Portal on October 4, 2026.

Home warranty insurance: the law since July 1999

Home warranty insurance pays to repair set kinds of construction defects in a new home for set periods. Section 22(1) of the Homeowner Protection Act says a person must not build a new home unless it is registered for this insurance. The Act's definition of a new home includes a strata's common property: the parts of the land and buildings outside the units, plus the pipes and ducts that serve more than one unit.

Section 22(2) sets the minimum cover: 2 years for defects in materials and labour, 5 years for defects in the building envelope, including water getting in, and 10 years for structural defects. The regulation defines the building envelope as the parts of a new home that separate and protect the inside from the outside climate, such as the walls, windows and roof. BC Housing calls this package 2-5-10 home warranty insurance.

In a strata building the 2-year cover has three parts. Schedule 3 of the Homeowner Protection Act Regulation gives 12 months for the unit itself, 15 months for the common property, and 24 months for the electrical, plumbing, heating, ventilation and air conditioning systems and for the exterior cladding, windows and doors.

The regulation took effect on July 1, 1999. Under its section 21, the Act and the regulation do not apply to a home built under a building permit applied for on or before June 30, 1999.

Where a 1990 to 2009 building stands in 2026

For your own unit, Schedule 3, section 5(2) starts it at the earlier of first occupancy and the transfer of title. For the common property, section 5(3) starts it on the same date as the first unit in each building.

Apply the minimum terms to downtown's commonest buildings. A building whose first unit was occupied in 2005 lost its 2-year cover in 2007, its envelope cover in 2010 and its structural cover in 2015. One first occupied in 2009 reached the end of its 10-year cover in 2019. A building whose permit was applied for by June 30, 1999 sits outside the warranty law altogether.

Some policies give more than the minimum. Section 15 of the regulation requires the warranty provider to give owners a schedule of expiry dates, common property included. Section 20(2)(a)(vii) of the Strata Property Act required the developer to give the strata all warranties for the common property at the first annual general meeting. Ask the strata for both.

The cover stays with the home. Schedule 2, section 2 of the regulation transfers all unused benefits to each later owner, so a resale buyer receives whatever time is left.

BC Housing's New Homes Registry shows, by address, whether a home has a home warranty insurance policy and whether a licensed builder built it. It holds homes registered since November 19, 2007. For a home registered from July 1999 to that date, BC Housing asks you to call its office.

Why the warranty rules still matter

While a warranty runs, section 11(1)(k) of the regulation lets the insurer exclude changes, alterations or additions made to a new home by anyone after initial occupancy, other than the builder's own warranty or contract work. In a 1990 to 2009 building, the original minimum cover has ended. A similar rule appears in a warranty that may still be running: the one on a repair to the building envelope.

Envelope repairs carry their own warranty

BC has a second regulation for repairs to leaking walls. The Building Envelope Renovation Regulation defines a building envelope renovation as construction work on a residential building to repair envelope defects that let water in, or to repair the damage that water caused. Under section 2, a person must hold a building envelope renovator licence to do or manage that work.

When the job is large enough, section 10 requires a 2-year materials and labour warranty, and section 11 adds a 5-year water penetration warranty, both counted from the date the work reached completion under the regulation's test. Large enough means two things. The cost is at least $10,000 or $2,000 for each unit in the building, whichever is greater. And the work replaces 60 percent or more of the cladding, the outer layer of wall that faces the weather, on the building or on one face of it. In a strata building, the strata corporation holds the warranty.

The age of the building sets one more limit. Section 3(1)(b)(viii) takes out a multi-unit building where the first unit was occupied 25 or more years before the envelope work began, or before its building permit was issued if that came first. A building first occupied in 2001 reaches 25 years in 2026. One first occupied in 2009 reaches it in 2034. On a building past that line this regulation sets no warranty, so read the contract the strata signed to see what its contractor promised.

Renovating next to a repaired wall

Section 14(1) of the envelope regulation lets the insurer exclude damage caused or made worse by an owner or a third party, and defects caused by work supplied by anyone other than the envelope contractor, its consultant and their crews. Your renovation crew is one of those others. Damage it causes to a repaired wall may be left out of the strata's warranty.

Standard Bylaw 5(1) requires written approval before an owner alters the exterior of the building, things attached to it such as balconies, or the windows and doors on the exterior. Standard Bylaw 8 makes the strata repair and maintain those same parts, including the ones that form part of a strata lot.

Before you plan work on an outside wall, a window, a balcony door or the finishes against them, ask the strata manager in writing:

  • Has the building had envelope repairs, and on which faces?
  • Is a materials and labour or water penetration warranty still running, and when does each expire? Section 18 of the envelope regulation requires the insurer to give the strata a schedule of those dates.
  • Does the strata want its envelope contractor or consultant to review the parts of our plan that touch the outer wall?
  • Is more envelope work planned, and will it need entry to the unit? Standard Bylaw 7 allows entry on 48 hours' written notice to repair common property.

The records to ask for, and the law behind each

Section 36 of the Strata Property Act requires the strata to give an owner copies of the records listed in section 35 within 2 weeks of a request, and the bylaws and rules within one week. These are the records we read for a building of this age.

Records to read before renovating a 1990 to 2009 downtown condo
Record What it tells you Where the law requires it
Building permit plans The building as designed: its walls, floors and services Strata Property Act, s. 20(2)(a)(i) and s. 35(2)(n)
Developer's warranties and manuals Original warranty terms and how shared systems are serviced Strata Property Act, s. 20(2)(a)(vii)
Home warranty expiry schedule When each part of the original cover ended Homeowner Protection Act Regulation, s. 15
Envelope repair contract and warranty dates Which walls were repaired, and when each warranty ends Strata Property Act, s. 35(2)(g); Building Envelope Renovation Regulation, s. 18
Depreciation report Planned work on walls, windows, balconies and pipes over 30 years Strata Property Act, s. 94; Strata Property Regulation, s. 6.2
Engineers' reports on major items Findings on the envelope and other systems Strata Property Act, s. 35(2)(n.2)
Electrical planning report Spare capacity before you add an appliance or a heat pump Strata Property Act, s. 35(2)(n.3); due by December 31, 2026 in Metro Vancouver
Hazardous materials report for your unit Where asbestos or lead sits in the areas the work will disturb Occupational Health and Safety Regulation, s. 20.112

Why the permit drawings are worth asking for

Section 20(2)(a)(i) required the developer to give the strata, at the first annual general meeting, all plans needed for the building permit, with any amendments. Section 20(2)(a)(ii) added any document showing that a pipe, wire or duct sits somewhere other than where those plans show it. Section 35(2)(n) makes the strata keep both. We ask the strata for the building's drawings where a wall or a pipe is in question.

What the depreciation report adds

A depreciation report is a study of the parts of the building the strata must repair, with the expected life and future cost of each. Our older tower page lists the items it must describe. Three other rules matter for a 1990 to 2009 building.

The report's date. Section 6.21(2) of the Strata Property Regulation requires a new report at least once every 5 years. Under section 6.21(3), a Metro Vancouver strata established before July 1, 2024 that had obtained no report since December 31, 2020 had to obtain one before July 1, 2026.

The money. Section 6.2(3)(e) requires at least 3 cash-flow funding models over 30 years, and section 6.2(4) lets those models use special levies. A special levy is a one-time charge to the owners under section 108 of the Act, on top of the regular strata fees. If the report plans envelope or window work through a special levy, put that date beside your renovation budget.

The split of duties. Section 6.2(2)(c) requires the report to identify the common property and limited common property that the owner must maintain and repair. Limited common property is common property set aside for the use of one or more units. Read that list before you plan work on a balcony or patio.

Asbestos in a building from the early 1990s

WorkSafeBC says asbestos was widely used in BC as a building material until the early 1990s, and that newer homes can contain asbestos if they were built with older materials. Downtown has 13,640 strata lots in buildings from 1990 to 1999, and the first years of that decade fall inside the period WorkSafeBC names.

The inspection is required at any age. Section 20.112(2) of the Occupational Health and Safety Regulation says that before renovation work begins, the employers responsible for it and the owner must ensure that a qualified person inspects for hazardous materials. The steps after a positive result are on our older tower page.

Yaletown: 6,005 of 6,581 strata lots from 1990 to 2009

Yaletown sits inside the Downtown local area. We count it by the Yaletown business improvement area, a boundary the City publishes for that business district and describes as approximate. The 2026 tax roll puts 6,581 strata lots inside it. Of those, 6,005 were built from 1990 to 2009: 4,029 in the 1990s and 1,976 in the 2000s.

Of those 6,005, 5,724 sit under the City's CD-1 and DD zoning codes. The other 599 Yaletown lots sit in the HA-3 historical area, where 318 date from before 1950 and need the checks on our Yaletown page.

How we plan the work

RealDream Contracting is based in North Vancouver and takes on condo work in Vancouver and downtown Vancouver. We read the building's bylaws and rules, its depreciation report and its electrical planning report where it has one, and we arrange the hazardous materials inspection before the price is fixed. We prepare the strata request with you, using the same scope of work as our contract, and we set the start date after the written approval arrives.

We publish no condo price list and price each unit after a visit. For comparison, our published 2026 ranges for a North Shore house are $65,000 to $110,000 for a full kitchen in the same layout and $28,000 to $48,000 for a full bathroom in the existing layout. Both are house figures.

To start, send us the year your building was finished, your bylaws and a floor plan through the contact form, or email info@realdream.ca.

Sources

Frequently asked questions

Does my downtown Vancouver condo built in 2005 still have home warranty insurance?

At the legal minimum terms, it does not. Section 22(2) of the Homeowner Protection Act sets 2 years for materials and labour, 5 years for the building envelope and 10 years for the structure, so a building first occupied in 2005 lost its last minimum cover in 2015. Some policies give more, so ask the strata for the policy's expiry schedule, which section 15 of the regulation requires the warranty provider to supply.

Did condos built in the early 1990s in Vancouver come with home warranty insurance?

The warranty law covers homes built under a building permit applied for after June 30, 1999. Section 21 of the Homeowner Protection Act Regulation says the Act and the regulation do not apply to a home built under a permit applied for on or before that date. The City's 2026 tax roll lists 13,640 Downtown strata lots built from 1990 to 1999.

How long does BC home warranty insurance cover the building envelope of a condo?

The minimum is 5 years for defects in the building envelope, including defects that let water in. That term is in section 22(2)(b) of the Homeowner Protection Act and Schedule 3, section 2 of its regulation. For the common property of a strata building, the cover starts on the same date as the first unit in that building.

Does home warranty insurance pass to me when I buy a resale condo?

Yes, for whatever time is left. Schedule 2, section 2 of the Homeowner Protection Act Regulation transfers all unused benefits to any later owner when ownership changes, with no notice to the warranty provider needed. BC Housing says the coverage stays with the home.

How can I check whether my building had home warranty insurance?

Search BC Housing's New Homes Registry by street address or legal description. It shows whether a home has a home warranty insurance policy and whether a licensed builder built it, for homes registered since November 19, 2007. For a home registered between July 1999 and November 19, 2007, BC Housing asks you to call its office.

Does a strata's repair of leaking walls come with a warranty in BC?

It does when the job is large enough. Sections 10 and 11 of the Building Envelope Renovation Regulation require a 2-year materials and labour warranty and a 5-year water penetration warranty when the work costs at least $10,000 or $2,000 per unit, whichever is greater, and replaces 60 percent or more of the cladding on the building or one face of it. The strata corporation holds the warranty.

Why might envelope repairs on an older downtown building carry no warranty?

Section 3(1)(b)(viii) of the Building Envelope Renovation Regulation takes out a multi-unit building whose first unit was occupied 25 or more years before the envelope work began. A building first occupied in 2001 reaches that line in 2026. For work past that line, read the contract the strata signed to see what its contractor promised.

Can my renovation affect the strata's warranty on repaired walls?

It can. Section 14(1) of the Building Envelope Renovation Regulation lets the insurer exclude damage caused or made worse by an owner or third party, and defects caused by work supplied by anyone other than the envelope contractor and its consultant. Get the strata's written approval under Standard Bylaw 5(1) before altering the exterior, a window or a balcony door, and ask whether a warranty is still running on that wall.

Can I get my building's original construction drawings from the strata?

Yes, if the developer handed them over. Section 20(2)(a)(i) of the Strata Property Act required the developer to give the strata all plans needed for the building permit at the first annual general meeting, and section 35(2)(n) makes the strata keep them. Under section 36, the strata must provide copies of those records to an owner within 2 weeks of a request.

How old can my strata's depreciation report be?

No more than 5 years. Section 6.21(2) of the Strata Property Regulation requires a new report at least once every 5 years. A Metro Vancouver strata established before July 1, 2024 that had obtained no report since December 31, 2020 had to obtain one before July 1, 2026, under section 6.21(3).

How many downtown Vancouver condos were built from 1990 to 2009?

The City of Vancouver's 2026 property tax roll puts 31,230 of the Downtown local area's 42,221 strata lots in buildings from 1990 to 2009: 13,640 from the 1990s and 17,590 from the 2000s. That is 74.0 percent of the area. We read the figures from the City's Open Data Portal on October 4, 2026.

How many Yaletown condos were built from 1990 to 2009?

Inside the Yaletown business improvement area, 6,005 of the 6,581 strata lots on the City's 2026 tax roll were built from 1990 to 2009: 4,029 in the 1990s and 1,976 in the 2000s. Another 318 date from before 1950, all under the HA-3 historical area zoning. We read the figures on October 4, 2026.

Related service

Condo Renovation

See how we plan, price and build condo renovation projects.

Learn about condo renovation

Where this applies

Free quote

Get a project estimate

Share a few details and we'll respond within one business day.

Ready to build?

Talk to RealDream Contracting.

Send an inquiry or book a consultation to discuss your project on the North Shore.

RealDream × Realtors

Let's build something together.

Leave your details. Let's talk about working together.

An introduction starts the conversation. Partnership terms are agreed together.

Prefer email? info@realdream.ca