The short answer
A concrete patio runs $18 to $35 per square foot installed in 2026, and composite decking runs $35 to $65 per square foot including the structural frame underneath it. Ground-level and gently sloped lots usually favour concrete, since it drains as a solid slab with no frame to trap moisture. Sloped North Shore lots, where the outdoor space sits a floor above grade, usually need a raised structure, which is where composite decking is the practical answer and where the BC Building Code requires a guard at least 900 millimetres high for any walking surface more than 600 millimetres above the ground below.
The lot decides more than the finish does
Concrete works as a poured slab sitting on prepared ground, which means it wants a location that is already close to grade, or can be brought close to grade with fill and compaction. On a flat or gently sloped backyard, a concrete patio is the simpler structure: excavate, compact a gravel base, form it, pour it, and it sheds rain as a solid surface with a slope built into the finish.
Composite decking is a surface material fastened to a structural frame, joists on posts and beams, and that frame is what actually does the work of getting you out over a slope, a walkout basement, or a grade change without a retaining wall. On the steeper North Shore lots, in areas like Deep Cove, upper Lynn Valley, and parts of West Vancouver where the house sits well above the natural grade at the back, a raised deck is often the only practical way to get usable outdoor space at all. In that situation the material comparison is almost beside the point, since a poured slab is not an option without a substantial retaining structure underneath it.
Where both are genuinely on the table, ground-level backyards with no meaningful slope, is where the rest of this comparison actually matters.
What each one costs in 2026
Concrete patio work runs $18 to $35 per square foot installed on the North Shore in 2026, with the range driven by finish. A broom-finished slab sits at the low end, stamped or exposed-aggregate concrete moves toward the middle, and a full stone-look stamped and coloured finish with a sealer reaches the top of the range.
Composite decking runs $35 to $65 per square foot installed, and that figure includes the structural frame, not just the decking boards on top. A simple low deck on a few posts sits toward the lower end. A raised deck over a walkout basement, with taller posts, additional footings, and a code-compliant guard system, runs toward the upper end, and a deck with built-in lighting, a privacy screen, or a roof structure over it goes higher still.
The framing underneath a composite deck is usually pressure-treated lumber, since the composite boards are a wear surface, not a structural member. That frame has its own lifespan and its own moisture exposure, which matters more on the North Shore than in a drier climate, and it is a cost most composite quotes bury inside a single per-square-foot number rather than breaking out separately.
| Concrete patio | Composite decking | |
|---|---|---|
| Basic finish | $18 to $22 per sq ft, broom finish | $35 to $42 per sq ft, low deck on a simple frame |
| Mid-range finish | $24 to $30 per sq ft, stamped or exposed aggregate | $45 to $55 per sq ft, raised deck with guard system |
| High-end finish | $30 to $35 per sq ft, coloured stamped concrete, sealed | $55 to $65 per sq ft, tall raised deck, lighting, screening |
| Structure included | Slab is the structure | Composite boards plus a full pressure-treated frame |
| Typical North Shore fit | Flat or gently sloped, ground-level backyards | Sloped lots, walkout basements, elevated outdoor space |
How each one handles Vancouver's rain
The Lower Mainland gets over 1,500 millimetres of rain a year in most North Shore areas, and that changes how each material actually performs compared with how it performs in a marketing brochure written for a drier market.
A concrete patio, built with the correct slope away from the house, sheds rain immediately across the whole surface. There is nothing underneath it to trap moisture, because there is no cavity. The failure modes on concrete here are surface ones: efflorescence, the white mineral deposit that appears when water moves through the slab and evaporates at the surface, and spalling from freeze-thaw cycles when water gets into surface pores and expands. Both are manageable with a properly cured slab, correct air content in the concrete mix, and a quality sealer reapplied every few years.
Composite decking sheds surface water well, since the boards themselves do not absorb moisture the way old wood decking did. The real question with composite on the North Shore is what happens underneath the boards, in the gap between the decking and the ground or the space below. If that area does not drain and ventilate, it becomes a damp cavity, and the pressure-treated frame underneath, along with any storage space below the deck, stays wet for long stretches through a North Shore winter. A deck built with proper spacing between boards, a drainage system under the frame on decks over living space, and ventilation at the skirting performs well. A deck built without those details traps water exactly where you cannot see it.
The detail that decides which failure mode you get is whether the deck sits over living space. A composite deck built directly over a basement walkout or a lower patio needs a true waterproof membrane system under the frame, not just gapped boards, because water passing between the boards has to go somewhere other than the room below.
Maintenance: what each one actually asks of you
Concrete asks for very little on a normal year. Rinse it, keep debris and organic matter from staining the surface, and reseal a stamped or coloured finish every 2 to 3 years to maintain the colour and protect against moisture intrusion. A plain broom-finished slab can go longer between sealing without much visible consequence. The main risk over time is cracking, usually from ground movement or a control joint that was not cut deep enough or spaced correctly during the pour, and a properly built slab with control joints every 2.4 to 3 metres manages that risk from the start.
Composite decking is marketed as low-maintenance compared with wood, and for the surface itself that is accurate: no staining, no sanding, occasional washing to clear algae or mildew, which grows more readily on composite in a shaded, damp North Shore backyard than most owners expect from the marketing. What composite does not eliminate is inspection of the structure underneath it. Fasteners, joist hangers, and the ledger connection to the house all need periodic checking, the same as they would on a wood deck, because the composite boards on top tell you nothing about the condition of the frame they are fastened to.
Neither material is maintenance-free. Concrete trades occasional resealing for structural simplicity. Composite trades surface upkeep for a frame that needs the same periodic attention any elevated wood structure needs in a wet climate.
Lifespan, honestly stated
A properly installed concrete patio, poured over a compacted and drained base with correct air-entrainment in the mix for our freeze-thaw cycles, lasts 25 to 40 years before it needs replacement rather than repair. Cracking can appear earlier, but a cracked slab is often still functional for decades; it is a cosmetic and sometimes a tripping-hazard issue rather than a failure of the whole system.
Composite decking boards themselves typically carry manufacturer warranties in the 25 to 50 year range against staining, fading, and structural failure of the board material, and quality composite genuinely holds up well on the surface. The frame underneath is the piece with the shorter honest lifespan. Pressure-treated lumber in a wet, shaded North Shore backyard, especially where drainage and ventilation under the deck were not built in properly, can need structural attention well before the composite boards on top show any wear at all. A deck that looks brand new on the surface at year 15 can still need joist and post replacement underneath if the moisture management was never right.
That mismatch, a long-lived surface on a shorter-lived frame, is the single most common thing we find when we are asked to assess an older composite deck for a homeowner who assumed the whole structure carried the boards' warranty.
BC Building Code guard height requirements for elevated decks
Any raised deck on the North Shore runs into a guard requirement the moment it clears a certain height, and this is where composite decks on sloped lots need real design attention rather than an afterthought railing kit from a hardware store.
The BC Building Code requires a guard where a walking surface is more than 600 millimetres above the adjacent ground or floor level. Where required, Article 9.8.8.3 sets the minimum guard height at 900 millimetres for a walking surface serving a single dwelling unit where the walking surface is not more than 1.8 metres above the adjacent ground level, and 1,070 millimetres where the walking surface is higher than that. On the sloped lots where a composite deck is most likely to be the right choice in the first place, walkout decks over a basement or a steep drop-off, that higher 1,070 millimetre threshold applies more often than owners expect.
Guards also have opening limits. A guard must be built so that a 100-millimetre sphere cannot pass through any opening in it, which governs baluster spacing and rules out a lot of the open-rail aesthetics homeowners bring in from Pinterest without checking the code first. Getting this wrong is one of the more common items that stalls a deck permit at inspection, because it is easy to design a railing that looks right and fails the sphere test by a few millimetres.
| Deck height above adjacent ground | Minimum guard height required |
|---|---|
| 600 mm or less | No guard required by this article |
| More than 600 mm, up to 1.8 m | 900 mm minimum |
| More than 1.8 m | 1,070 mm minimum |
Which one we actually recommend, and why
For a ground-level backyard with no meaningful slope, in neighbourhoods like Norgate or the flatter parts of Edgemont, we lean toward concrete more often than not. It is the simpler structure, it has fewer places for water to hide, and the long-term maintenance is lower-effort even though it needs occasional resealing.
For a sloped lot or a walkout basement situation, common in Deep Cove, upper Lynn Valley, and much of West Vancouver's hillside terrain, composite decking on a properly engineered frame with real drainage and ventilation underneath is the right call, because it is often the only way to get usable outdoor space without a major retaining wall project. The cost premium over concrete is the cost of the structure that makes the space possible at all.
The mistake we see most often is choosing composite for its low-maintenance reputation on a lot where concrete would have been simpler, cheaper, and just as durable, or building a composite deck over a basement walkout without a proper membrane because the quote didn't include one. Match the material to what the lot actually needs, and the maintenance conversation mostly takes care of itself.
Sources
Frequently asked questions
Is concrete or composite decking cheaper per square foot on the North Shore?
Concrete is cheaper for a comparable finish level, running $18 to $35 per square foot installed against $35 to $65 per square foot for composite decking including the structural frame. But the comparison only holds on a lot where both are actually options. On a sloped site needing a raised structure, concrete usually is not a practical alternative at all, so the cost gap reflects the structure required, not just the surface material.
Why does composite decking cost more than the boards alone would suggest?
Because the quoted price includes the full pressure-treated structural frame underneath, posts, beams, joists, and footings, which the boards are fastened to. Composite decking is a wear surface, not a structural material, so any composite deck quote that only covers the boards is not pricing the whole job. On a raised deck with taller posts and additional footings for a code-compliant guard, that frame is a meaningful share of the total cost.
Does concrete crack in North Vancouver's climate?
It can, usually from ground movement or from control joints that were not cut deep enough or spaced correctly during the pour. A properly built slab with control joints every 2.4 to 3 metres and correct air-entrainment in the concrete mix for our freeze-thaw cycles manages that risk. A cracked slab is often still functional for years afterward; it is typically a cosmetic issue rather than a structural failure.
What BC Building Code guard height applies to my deck?
Article 9.8.8.3 requires a guard where a walking surface is more than 600 millimetres above the adjacent ground, at a minimum height of 900 millimetres for decks up to 1.8 metres above grade, and 1,070 millimetres for anything higher than that. On sloped North Shore lots with a walkout deck over a basement, the higher 1,070 millimetre threshold applies more often than owners expect, since the drop to grade is usually well past 1.8 metres.
Can a composite deck be built directly over a basement walkout without leaking?
Yes, but it needs a true waterproof membrane system under the frame, not just gaps between the boards for drainage. Water passing between composite boards on a deck over living space has to be captured and directed away from that space below, and a deck built without that membrane will eventually leak into the room underneath regardless of how well the composite surface itself performs.
Does composite decking need any maintenance at all?
The boards themselves need little: occasional washing to clear algae or mildew, which grows more readily on composite in a shaded, damp North Shore yard than the marketing suggests. What still needs periodic attention is the structural frame underneath, the fasteners, joist hangers, and the ledger connection to the house, since the composite surface gives no indication of the frame's condition below it.
How long does a concrete patio last compared with a composite deck?
A properly built concrete patio lasts 25 to 40 years before it needs replacement rather than repair. Composite decking boards carry manufacturer warranties in the 25 to 50 year range, but the pressure-treated frame underneath often has a shorter real-world lifespan in a wet, shaded North Shore yard, especially where drainage and ventilation under the deck were not built in properly. The frame, not the boards, is usually the limiting factor on a composite deck's actual service life.
Which is better for a flat backyard, concrete or composite?
On a flat or gently sloped ground-level lot, concrete is usually the simpler and more durable choice, since it is a solid slab with no cavity underneath to trap moisture and lower long-term maintenance beyond occasional resealing. Composite decking makes more sense on a flat lot mainly where the look or feel of a wood-style deck is specifically wanted, since the structural need that justifies composite's cost on a sloped lot is not present.
Why do sloped North Shore lots usually need decking instead of a concrete patio?
Because concrete is a poured slab that needs ground close to the finished grade, while decking sits on a structural frame that can span a slope, a walkout basement, or a grade change without a major retaining wall. On steep lots in areas like Deep Cove and upper Lynn Valley, a raised deck is often the only practical way to get usable outdoor space, which makes the frame cost part of getting the space at all rather than an optional upgrade.
Does a deck railing need to pass a specific opening size test in BC?
Yes. Under the BC Building Code, a required guard has to be built so that a 100 millimetre sphere cannot pass through any opening in it, which governs baluster and rail spacing. This detail fails inspection more often than most homeowners expect, since an open-rail design that looks correct can miss the sphere test by a small margin, and it is worth confirming spacing against the code before finalizing a railing design rather than after it is built.
Does a concrete patio need a permit on the North Shore?
It depends on height and whether it is attached to the house, but a raised deck almost always needs a building permit given the structural and guard requirements involved. Confirm with the City or District of North Vancouver or West Vancouver building department for the specific project, since requirements and thresholds are set municipally and can differ between the City and District of North Vancouver.
Related service
Site Work & Drainage
See how we handle site work & drainage projects across the North Shore.
Learn about site work & drainageWhere this applies